The following 'web' programs need to be changed:
- WEB.ASSIGN.MFGPLANT
- WEB.CREATE.QUOTE (THIS MAY ALREADY BE COMPLETE)
- WEB.MODITEM.GETPRICE
- WEB.OPER.TABLEINFO
The Avante programs that will be changed are listed in the Avante section of the Wiki:
SSMS9007.1 - BS/SW TABLE
SSMS9008.1 - CREATE ROUTMST FOR STOCK ITEM
SFCS9004.1 - PRINT TRAVELER/PICKLIST
SOPS9085.1 - FRT DATA DOWNLOAD
SOPS9097.3 - CALC PKG UPCHARGES
SOPS9148.1 - ASSIGN PRINT PLATE#
EPCS9008.1 - ASSIGN MFG FACILITY
QUOS4000.4PS - PLATE CHARGE CALC
QUOS9008.1 - QUOTE DOWNLOAD FOR FRT ANALYSIS
12/13/13 - I spoke w/David about what it will take to implement these changes for the old site for Atlanta's planned startup date of Feb 2014 (before new site will be ready):
- David - BAGS configuration - Atlanta pass/fail logic for Bottomseal and Sideweld **sideweld logic has more than bottomseal
- David - All other configurations - Atlanta pass/fail logic for Bottomseal *** bottomseal logic not too bad - close to TX logic
- David - all configurations - new criteria for MFG_PLANTS lookup to assign FINAL PLANT
- David - Modifications to MFG_PLANTS AND BG, SWG, SWSG tables
- Judy - Manufacturing Plants assignment program (current version and new web version)
- Judy - Avante programs that need to know about 02-Atlanta